Optimize Equipment Utilization




Major portion of savings, can be achieved

by going beyond utility bill — i.e. below the surface. Eliminating

or delaying capital costs for new investments in distribution equipment

(LV switchgear, transformer, cables, ..) additional 2-5%

savings are possible by better utilizing the existing electrical infrastructure.



• Prolong equipment life by identifying stress factors

   (e.g. high harmonics, unbalanced systems or transients)

 

• By balancing loads on substations, transformers,

   distribution boards, and other distribution equipment

   overloads on individual branches can be avoided

 

• Optimize use of existing distribution equipment capacity to

   delay or eliminate capital expenses

 

• Compare the performance of facilities or processes and

    identify low performer

 

• Active load management can disconnect uncritical loads to

   cutoff peak loads